The subject of this news: a new act, drawn up by representatives of NPO Bronya LLC, stating that the boiler house of the Oktyabrskaya Revolution Shipyard JSC is in the boiler room. Amur region, Blagoveshchensk, st. Pushkin 189, a test application of 1 mm "Bronya Standard" was carried out on a hot pipe section with a surface temperature of +85.9 ° C.
The purpose of the test was to determine the effectiveness of the use of heat-insulating coating series "Bronya" for thermal insulation of the heating system.
The temperature difference in the pipe section "With" the applied coating Bronya and "Without" made it possible to mathematically obtain, and to issue in the conclusion confirmation of the declared thermophysical characteristics.