We present to your attention a photo and video report of the global work of those
insulation of a large space to create a large-scale spa center in it. A huge premise that was previously used as a parking lot for a large shopping center, it was decided to convert it into a building that will be the Moskovskiye Termy spa center with various types of various thermal procedures. When calculating the thermal resistance by thermal engineering calculations, it turned out that 150 mm of mineral wool is needed, absolutely non-combustible, with such a level of clear understanding of the vapor permeability of the final lining that, given the low level of the ceilings and the architectural features of this building, it was not absolutely possible to insulate it with traditional heaters. And our Bronya materials have become literally a panacea and salvation in this situation. When planning this project, there were fears of condensation, and on the ceiling of the room, especially given the high humidity in the conditions of the SPA center, but the use of Bronya Zima NG completely eliminated the possibility of condensation. The material was applied with a total layer thickness of 3 mm using an airless deposition apparatus. The work began in January and was completed at the end of March, last year, 2021, mainly at negative temperatures. Our thermal insulation at this facility has passed the examination of both documentary fire (due to the presence of the necessary mandatory Fire certification) and thermophysical - (and documentary thanks to the legitimate confirmation of thermal conductivity of 0.001, and in fact, the task was fulfilled). The total need amounted to a lot of tons