We present you a photo report on the use of several modifications of the Thermal Insulation Bronya on the heating pipeline of the Volgograd State Socio-Pedagogical University at the stage of pre-installation. For the thermal insulation of the pipeline, three modifications of Bronya Metal were used - to prevent corrosion of pipes, Bronya Standard - as the main insulation layer and the finishing active layer Bronya Standard NF to comply with the regulations for educational institutions. The work was carried out with a standard paint brush in four layers of 0.5 mm each with interlayer drying for 24 hours.
Thermal insulation Bronya on the heating pipeline of the Volgograd State Socio-Pedagogical University (photo)
We present you a photo report on the use of several modifications of the Thermal Insulation Bronya on the heating pipeline of the Volgograd State Socio-Pedagogical University at the stage of pre-installation. For the thermal insulation of the pipeline, three modifications of Bronya Metal were used - to prevent corrosion of pipes, Bronya Standard - as the main insulation layer and the finishing active layer Bronya Standard NF to comply with the regulations for educational institutions. The work was carried out with a standard paint brush in four layers of 0.5 mm each with interlayer drying for 24 hours.
17 December 2018