Bronya Antikor and Bronya Classic for thermal insulation of hot water and cold water pipes of a five-story residential building. Replacing the outdated method of thermal insulation with our innovative thermal insulation Adler, Sochi. (Photo and video)
10 June 2022
Good day. We present to your attention the process and result of work on replacing mineral thermal insulation with liquid, ultra-thin thermal insulation Bronya on pipes for hot and cold water supply of a five-story residential building at Lenina 48 in Adler, Sochi.
The management company "Doverie" was given the task of dismantling the old mineral wool which had heat-insulated pipes and resorting to a more modern, innovative and economical solution - to use our heat-insulating modifications Bronya Antikor and Bronya Classic.
Stages of work on thermal insulation of hot water and cold water pipes (D40-50, 253 linear meters):
1. Dismantling of the old thermal insulation.
2. Mechanical cleaning of pipes from loose rust.
3. Degreasing the pipe surface.
4. Applying a layer of Bronya Anticorrosive 0.5mm thick.
5. Applying 2 layers of Bronya Classic 0.5mm thick.
Now the pipes are completely protected from corrosion and heat loss, which will significantly reduce the cost of water supply.