Friends, we are sharing with you a new excellent integrated implementation work "Bronya Samara".
At the design stage, in order to achieve the required heat transfer resistance of the structure, the architects laid down the Bronya Wall vapor-permeable heat-insulating coating in the estimate documentation with a subsequent examination.
The project provided for a certain predetermined insulation of the loggia in the new apartment building and our coating coped with the dsotoinstvo.
Before applying thermal insulation, the surface was previously dust-free and covered with a deep penetration acrylic primer for Bronya concrete surfaces. Then, using an ordinary brush, 1 mm thick Bronya Wall thermal insulation was applied.
Builders, designers, and most importantly, the new owners of the apartments were satisfied!
Insulation of loggias planned at the design stage of an apartment building in Togliatti, Samara region. (photo + video)
18 January 2021