We present to your attention photos and videos of works on thermal insulation of the facade of the Volna boarding house in Togliatti, Samara region.
Before applying thermal insulation, the surface was de-dusted and covered (primed) with Bronya Winter NF strongly diluted with orthoxylene. Then, using a conventional paint brush, applied thermal insulation Bronya Winter NF. The thickness of the insulation layer was 1 mm. the Work was carried out at negative temperatures.
The very next day, the customer himself made measurements of the walls from the inside with a pyrometer and compared them with the readings of the raw wall, and was pleasantly surprised by the data obtained.
Plans to produce thermal insulation not only on the second floor of the boarding house building but also other infrastructure facilities and departmental communications.