We present to your attention a photo and video report on the thermal insulation of the Tetra Pak waste disposal warehouse with the use of the Bronya Thermal Insulation.
On the entire internal area of walls and ceiling, the problem of condensate formation on the surface of the roofing proflist was solved. At negative temperatures condensation formed on the surface, and then it turned into ice. With warming, the ice melted, the water dripped to the floor and froze again, which greatly hampered the movement of forklifts and working personnel across the warehouse.
From the end of December 2017 to early February 2018 Bronya Nord was inflicted with the aid of the airless Graco. After the work on applying the Bronya Nord material with a total coating thickness of 3 mm, the problem was completely solved.